Your IoT product — from schematic to box.
We design PCBs, write firmware, build enclosures and create mobile apps. We manufacture series from 50 units. No need to coordinate four companies.
Building hardware is hard. We know.
MOQ too high
Most EMS manufacturers won't talk below 10,000 units. Half won't even reply.
Fragmented supply chain
PCB designer. Firmware house. Mechanical engineer. EMS factory. Each handoff is a delay.
China risk
8-week lead time, timezone gap, language barrier, IP risk.
NPI is a minefield
Prototype → pilot → production is a minefield. Most design houses drop you after the schematic.
Everything you need — one partner
From schematic capture to production line. No handoffs, no coordination overhead.
Schematic, layout, simulation, production files. Multi-layer, HDI, rigid-flex. KiCad, Altium.
ESP32, STM32, nRF52. FreeRTOS, Zephyr. BLE, Wi-Fi, NB-IoT, LoRa. OTA updates.
IP20 to IP67. 3D printing, injection molding. SolidWorks, Fusion 360.
iOS + Android. React Native or native. MQTT, REST API, cloud dashboard.
SMT + THT. Series from 50 to 10,000 units. ICT, AOI testing. Full traceability.
Poland vs. China — side by side
EU-based manufacturing with shorter lead times, stronger IP protection, and no timezone gap.
| ideatronik (Poland) | China | |
|---|---|---|
| Timezone | CET (1h from DE) | UTC+8 (7h gap) |
| IP Protection | EU law, NDA day 1 | Difficult to enforce |
| Lead time (prototype) | 4-6 weeks | 8-12 weeks + shipping |
| Site visit | 2h flight from Berlin | 12h+ flight |
| CE certification | Included in project | Separate process |
From concept to 5 countries
ControlBee
IoT beehive monitoring system. GPS, GSM, BLE sensors, Android/iOS app. Gold medal APIMONDIA 2022. EU Horizon 2020 DEMETER project.
Frequently asked questions
Send us your project brief.
We'll get back with a preliminary estimate within 48 business hours.